JIS G3445 Stkm 13A Stkm 13b Stkm 13c Cold Drawn Seamless Precision Honed Carbon Steel Tube for Hydraulic Cylinder Barrel
1. Description: Honed tube is a kind of smooth bore steel tube used to manufacture hydraulic cylinder barrels that is the core part of a piece of hydraulic cylinder.
SAE/AISI: | SAE1020, SAE1026, SAE1045, SAE4130, SAE4140 |
DIN: | ST52, ST52.3, ST52.4 |
EN: | E355, C45E, 25CrMo4, 42CrMo4, CK45, S45C, E410, E470 |
GB: | 20#, 45#, 16Mn, Q345B, Q345C, Q345D, Q345E, 25Mn, 27SiMn, |
BK | BKW | BKS | GBK | NBK | Q+T |
+C | +LC | +SR | +A | +N | |
Cold rolled | Cold drawn | Stress relieved | Annealed | Normalized | Quenched+Tempered |
ID range | Tolerance | ID range | Tolerance |
18< d ≤30 | +0/+0.033 | 180< d ≤250 | +0/+0.072 |
30< d ≤50 | +0/+0.039 | 250< d ≤300 | +0/+0.081 |
50< d ≤80 | +0/+0.046 | 300< d ≤315 | +0/+0.081 |
80< d ≤120 | +0/+0.054 | 315< d ≤400 | +0/+0.089 |
120< d ≤180 | +0/+0.063 | 400< d ≤500 | +0/+0.097 |
13. Difference between honed tube and skived&roller burnished tube: In hydraulic cylinder industry, there are 2 solutions for bore treatment: Honing, and skiving&roller burnishing. Honing or skiving&roller burnishing leads to different internal surface image, but both ensure good roughness.
14.FREQUENTLY ASKED QUESTIONS
1.) MOQ: Generally Min Order Quantity can be 2-3 tons/size for tubes with OD below 250mm, and 10 tons/size for tubes with OD above 250mm. Sometimes, it depends on steel grade you need. If you need special grade like E410, E470 or alloy steel tube, MOQ should be 10 tons/size at least.
2.) Delivery Time: Generally, our delivery time for honed tubes is around 40-60 days depending on the sizes and quantities. It will take us 15-30 days to get raw material. For example, if you need 3 tons of small size honed tubes 50mm*40mm with roughness of Ra0.25um max, it will take us at least 30 days to hone this size.
3.) Warranty&Guarantee: Warranty&guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.
4.) Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.